欧美日韩一二三四,成人性生交片无码免费,亚洲欧美国产视频,91色情A三级A三级A三级

Language:CHINESESENGLISH

Home > News > the construction quality steel welding acceptance of the relevant provisions
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://

the construction quality steel welding acceptance of the relevant provisions

Time:[2016-1-27]  Hits:4828

Guangzhou Steel tells you: the construction quality steel welding acceptance of the relevant provisions

Guangzhou Steel tells you :( a) General provisions
Carbon structural steel should be cooled to ambient temperature in the weld, low-alloy structural steel welding should be completed after 24h, conduct inspection of welds.
(B) steel member Welding Engineering
1. Master Project
(1) Match rod, wire, flux, electroslag weld nozzles and other welding material and the base material shall comply with the design requirements and current national industry standard "construction steel welding procedure" JGJ81-2002; the electrodes, flux, medicine cored wire, melt in the mouth, etc. before use, should be required to its product specifications and welding process documents for baking and storage.
(2) welder must pass the examination and obtain a certificate. Certified welders welding must pass the examination in their projects and their scope of accreditation. Should fully examine all welders certificate and scope of accreditation, valid.
2. General Project
Weld feel should be achieved: a uniform shape, good shape, bead and bead between the bead and base metal transition smoother, welding slag and spatter basic clean.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號